Vesgantti 8 Inch Multilayer Hybrid Full Mattress - Multiple Sizes & Styles Available, Ergonomic Design with Memory Foam and Pocket Spring, Medium
85% of respondents would recommend this to a friend
BDT 31622
Price Details
Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )
*All items will import from US
QTY:
Ubuy works hard to protect your security and privacy. Our advanced payment security system ensures confidentiality by encrypting your information during transmission using AES (Advanced Encryption Standards) and SSL (Secure Socket Layer) protocols. Your payment details are 100% secure as we do not share your payment details with third party sellers.
Enjoy a comfortable sleep every night with the Vesgantti Hybrid Memory Foam Mattress.
Fast
Shipping
Free
Return*
Secure Packaging
100% Original Products
PCI DSS Compliance
ISO 27001 Certified
What Stands Out
Product Details
- 【Posh Hybrid Design】CertiPUR-US certified memory foam and 7-zone pocketed innerspring hybrid construction. Provides adequate support, while also conforming to the body to better release pressure, offering a balanced sleep experience for all sleepers
- 【Ultra Quiet】The innerspring work independently of each other with better motion isolation, less noise and longer service life. Slow-rebound foam provides good cushioning pressure release, effectively absorbing sound and vibration, allowing you to sleep soundly all night
- 【Breathable Mattress】Vesgantti mattress designed with a breathable knitted fabric cover and multiple layers of foam to help enhance airflow circulation and dissipate body heat for a cool and comfortable sleeping environment
- 【Sleep Well】Vesgantti Hybrid Mattress offers a medium firm plush feel, Satisfies most people's sleep preferences, You can enjoy a comfortable sleep every night with the purchase of our mattresses
- 【Mattress In a Box】The mattress arrives compressed and rolled in a box for easy delivery and setup. Simply unbox, unroll, and let it expand to its full size within a few hours, but please allow 24-72 hours for it to fully expand
| Item Firmness Description | Medium Firm |
| Mattress Coil Type | Pocketed Coil |
| Construction Type | Hybrid |
| Size | Full |
| Item Dimensions L x W x Thickness | 75"L x 54"W x 8"Th (190.5 x 137.2 x 20.3 cm) |
| Item Weight | 59 Pounds (26.76 kg) |
| Item Thickness | 8 Inches (20.3 cm) |
| Item Dimensions | 75 x 54 x 8 inches (190.5 x 137.2 x 20.3 cm) |
| Item Depth | 8 inches (20.3 cm) |
| Fill Material | Memory Foam |
| Mattress Comfort Layer Material | Memory foam |
| Material Type | Cotton, Memory Foam, Pocket Spring |
| top-style | Tight Top |
| Color | Grey |
| Style Name | Modern |
| Brand Name | Vesgantti |
| Model Name | BD30010 |
| Product Benefits | Pressure Relief |
| Model Number | BD30010 |
| UPC | 199967006535 |
| Manufacturer | Vesgantti |
| Set Name | 8" Grey |
| Manufacturer Part Number | BD30010 |
| Unit Count | 1.0 Count |
| Included Components | mattress |
| Brand | Vesgantti |
| Product Dimensions (L x W x H) | 75"L x 54"W x 8"Th (190.5 x 137.2 x 20.3 cm) |
| Top Style | Tight Top |
| Coil Type | Pocketed Coil |
Who Should Buy?
-
Back Pain Sufferers
The medium firm feel provides support for the spine, helping those with back pain sleep comfortably.
-
Couples Sharing
The pocket spring design minimizes motion transfer, making it ideal for couples who do not wake each other.
-
Varied Sleep Positions
This mattress suits different sleeping positions, providing adequate support for side, back, and stomach sleepers.
-
Budget-Conscious Buyers
While offering quality, the cost might be higher than basic mattresses, which could deter budget-focused shoppers.
-
Very Soft Preference
Individuals seeking a softer mattress may find the medium firm feel less than comfortable for their needs.
-
Heavyweight Users
For heavier individuals, the 8-inch thickness may not provide adequate support, leading to discomfort and sagging.
Product Description
Related Searches
Customer Questions & Answers
-
Question:
What materials are used in the Vesgantti 8 Inch Multilayer Hybrid Full Mattress?
Answer: The Vesgantti 8 Inch Multilayer Hybrid Full Mattress combines memory foam with pocket spring technology. The top layer features high-density memory foam that contours to your body for optimal comfort while providing support. The pocket springs underneath work independently to reduce motion transfer, perfect for couples or restless sleepers. This combination not only promotes a restful night's sleep but also enhances the air circulation within the mattress, ensuring you stay cool throughout the night. -
Question:
What are the benefits of the ergonomic design in this mattress?
Answer: The ergonomic design of the Vesgantti mattress ensures that your body is properly aligned during sleep. This design helps to alleviate pressure points, particularly in areas like the shoulders, back, and hips. By supporting natural spinal alignment, the mattress can reduce discomfort and improve overall sleep quality. It's especially beneficial for side sleepers who require additional cushion while still enjoying adequate support for joints and the spine. -
Question:
How does the mattress help with motion isolation?
Answer: The pocket spring system in the Vesgantti mattress is a key feature for motion isolation. Each spring acts independently, meaning that if one person shifts or gets out of bed, the motion is not transferred across the mattress. This helps ensure that your sleep is not disturbed by a partner's movements, making it an ideal choice for couples who might have different sleep habits or schedules. -
Question:
Is the Vesgantti mattress suitable for all sleeping positions?
Answer: Yes, the Vesgantti 8 Inch Multilayer Hybrid Full Mattress is designed to accommodate all sleeping positions. With its combination of medium firmness and ergonomic support, it caters to back, side, and stomach sleepers alike. The memory foam offers contouring support, while the pocket springs provide sufficient bounce and responsiveness, allowing sleepers to change positions comfortably throughout the night. -
Question:
What sizes and styles are available for this mattress?
Answer: The Vesgantti 8 Inch Multilayer Hybrid Full Mattress is available in multiple sizes to suit your needs, including Twin, Full, Queen, and King. Additionally, the mattress comes with a stylish, breathable cover that complements various bedroom decors. This versatility allows you to choose the perfect fit and aesthetic for your space without compromising on comfort. -
Question:
How can I clean and maintain the Vesgantti mattress?
Answer: To maintain the Vesgantti 8 Inch Multilayer Hybrid Full Mattress, it's important to keep it clean and well-ventilated. Regularly rotate the mattress to prevent uneven wear and prolong its lifespan. Spot clean any stains with a mild detergent and a damp cloth; avoid soaking the mattress. Additionally, using a mattress protector can safeguard against spills and dust mites, ensuring a healthier sleeping environment. -
Question:
Where can I purchase the Vesgantti 8 Inch Multilayer Hybrid Full Mattress?
Answer: You can buy the Vesgantti 8 Inch Multilayer Hybrid Full Mattress at Ubuy in Bangladesh. Ubuy offers a selection of sizes and styles, ensuring you can find the right fit for your needs conveniently. Their user-friendly platform makes it easy to browse available options and make informed choices for your sleep comfort. -
Question:
Is the mattress compatible with adjustable bed frames?
Answer: Yes, the Vesgantti 8 Inch Multilayer Hybrid Full Mattress is compatible with adjustable bed frames. Its flexible design allows it to bend and flex without losing support or comfort, making it a great option for those seeking personalized sleep positions. This compatibility enhances the versatility of your sleeping arrangement, allowing you to elevate your head or feet for optimal relaxation. -
Question:
What is the medium firmness level of the Vesgantti mattress?
Answer: The medium firmness level of the Vesgantti mattress strikes a perfect balance between comfort and support. It’s designed to accommodate a wide range of sleepers by providing just enough give to relieve pressure points while maintaining adequate support for the spine. This makes it particularly suitable for individuals who prefer a balance of softness and firmness for a good night’s sleep. -
Question:
Can I use a mattress topper with the Vesgantti mattress?
Answer: Yes, you can use a mattress topper with the Vesgantti 8 Inch Multilayer Hybrid Full Mattress to enhance comfort levels further. If you desire additional plushness or specialized support, a topper can easily be added on top. This combination allows for a customizable sleep experience, adapting to your personal preferences while still enjoying the inherent benefits of the hybrid design.
Customer Reviews & Ratings
-
5 Star
75%
-
4 Star
13%
-
3 Star
7%
-
2 Star
2%
-
1 Star
3%
Review this product
Share your thoughts with other customers
Platform Trust & Buyer Confidence
“The product received very good packaging & safe…Thank You”
“Accurate delivery timing given”
“Not madly expensive like I thought, and much quicker than promised.”
“Never dealt with Ubuy before, but everything worked out great. Seamless cross border purchasing and shipping. Thanks!”
“The process was smooth, with clear communication and timelines. This was my 1st purchase and I am really impressed. I will definitely be coming back.”
Top selling Hybrid Mattress in Canada
Product Price History
Important information
- Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
- Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.
BDT 31622
Order now and get it around Wednesday, July 08
This item is not restrict in my country.(Please click on above link if this item is not restrict in your country, So our team will review and allow.)
QTY:
Ubuy works hard to protect your security and privacy. Our advanced payment security system ensures confidentiality by encrypting your information during transmission using AES (Advanced Encryption Standards) and SSL (Secure Socket Layer) protocols. Your payment details are 100% secure as we do not share your payment details with third party sellers.
Features & Benefits
- Posh hybrid design with CertiPUR-US certified foam for ultimate support.
- 7-zone pocketed innerspring for improved motion isolation and reduced noise.
- Breathable knitted fabric cover enhances airflow for a cool sleeping experience.
- Medium firm plush feel caters to diverse sleep preferences.
- Convenient mattress-in-a-box design for easy delivery and setup.
- Allows for pressure relief and balanced sleep for all types of sleepers.




























