0 ratings
10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))
High quality and long life. Tinker, DIY and hobbyists must!
10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))
Item #: 83482254

10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))

Item #: 83482254

BDT 2183

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from US

0 ratings Write a review
In stock
us Imported from USA store

QTY:

Order now and get it around Tuesday, September 01
Our Top Logistics Partners
  • fedex
  • dhl
High quality and long life. Tinker, DIY and hobbyists must!
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
Note: Step Down Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

What Stands Out

High Voltage Rating
Rated for 450V, these capacitors provide superior performance in high-stability applications, ensuring reliability in tube amplifiers and other critical electronics.
Generous Capacity
With a capacitance of 100μF, these capacitors enable efficient power storage, improving the overall performance and sound quality of audio equipment.
Versatile Kit
This 5-piece collection includes various long lead capacitors, offering versatility for different builds and repairs, ideal for audio enthusiasts and professional technicians alike.

Product Details

Shop 10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in)) online at a best price in Bangladesh. B0CYBHQH4X
Capacitance47 Microfarad
Item ShapeRound
Operating Voltage450 Volts
Capacitance Tolerance20
Maximum Voltage450 Volts
Mounting TypeThrough-Hole Mount
Upper Temperature Rating105 Degrees Celsius
Material TypeAluminum
Item Dimensions W x H0.63"W x 0.98"H (1.6 cm)
Brand NameCermant
ManufacturerCermant
Part NumberCelent_CL230-233
ModelCelent_CL230-233
Unit Count10.0 Count
BrandCermant
MaterialAluminum
ShapeRound
Item Weight0.2 lbs (90 grams)

Who Should Buy?

Suitable For
  • Audio Enthusiasts

    Perfect for DIY tube amplifiers or audio circuit builders looking for reliable capacitors.

  • Electronic Hobbyists

    Ideal for hobbyists who need versatile capacitors for various electronics projects and prototypes.

  • Repair Technicians

    Useful for technicians repairing older audio equipment requiring specific capacitance ratings and voltage specifications.

Not Suitable For
  • Non-Audio Projects

    Not suitable for users who require capacitors for non-audio applications, as specifications may vary greatly.

Product Description

10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))

Have any Query? Chat with us

Customer Questions & Answers

  • Question: How to Shop 10pcs 450V 47UF Aluminum Radial Electrolytic Online From Ubuy?

    Answer: It’s easy to shop 10pcs 450V 47UF Aluminum Radial Electrolytic online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location.
  • Question: Is 10pcs 450V 47UF Aluminum Radial Electrolytic Available to Shop Online in Bangladesh?

    Answer: Yes, at Ubuy Bangladesh this product is available for you to shop at a reasonable price. The 10pcs 450V 47UF Aluminum Radial Electrolytic is not available locally but you can trust us with our express shipping services.
  • Question: How Long Does It Take to Get Product After Placing the Order?

    Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.

Cermant Capacitors Editorial Review

The Cermant 10pcs 450V 68UF Capacitors have garnered positive feedback from customers, particularly for their effectiveness in electronic repairs and projects. Many users have highlighted the excellent performance of these high-frequency aluminum electrolytic capacitors, noting their reliability as replacements in various circuit applications. One satisfied customer shared a personal success story about using these capacitors to revive their 70” TV after a thunderstorm damaged the original components. The direct replacement not only restored the TV to functionality but also left them "couldn’t be happier" with the outcome. Similarly, enthusiasts working on older equipment, such as a 1960s Gonset SSB exciter/transmitter, reported that these capacitors handled full voltage perfectly, making them a valuable asset in restoration projects. Users have also appreciated the quality versus price ratio, with remarks about the fair pricing and the performance of the capacitors being cited as a great deal. Many feedback entries emphasize that there have been no problems reported while using these components, demonstrating their reliability across different applications. In summary, customers are highly satisfied with the Cermant Capacitors, finding them to be reliable, effective, and worth the investment for both repairs and projects. **

Customer Reviews & Ratings

5.0
1 customers ratings
  • 5 Star
    100%
  • 4 Star
    0%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Pros

  • High performance and reliability as replacements
  • Positive user experiences in repairs and restoration
  • Good value for price
  • Low leakage characteristics
  • Effectively meets expected specifications

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.